The largest retail bank group in the UK

By Applied Power Engineering on Jun 14, 2024 8:45:00 AM

featured-image

A large banking facility recently commissioned Applied Power Engineering to supply them with a controls solution. The project brief was to replace an obsolete original Dale 8000 series multiple engine control system which provided emergency standby power to the facility. This system c …

Read Story

Topics: Case Studies

Retail Distribution Centre

By Applied Power Engineering on Jun 4, 2024 12:30:00 PM

featured-image

APE completed the supply, installation and commissioning of a 1500kVA standby rated Mitsubishi based diesel generator for a well-known supermarket chain. An open set installed into a generator plant room for the electrical contractor EIC Ltd, completed with inlet, discharge acoustics …

Read Story

Topics: Case Studies