---
title: Nationwide STC, Swindon | Case Studies | A.P.E
description: Applied Power Engineering was commissioned to convert three existing HV (High Voltage) generators and mains control system, adding DUAL redundancy, STOR functionality and implementing some additional ‘What if Scenario's’ to the original system.
image: https://www.appliedpowerengineering.com/hubfs/Images/case-study/nationwide-stc-swindon.webp
---

[30th Growth Ave, NY 1003, USA](https://g.page/hubspot-cambridge-25-first?share) [+212-800-1234](tel:+212-800-1234) [info@yourcompany.com](mailto:info@yourcompany.com)

Amazing

[01709 711 084](tel:+212-800-1234) [info@apeltd.com](mailto:info@yourcompany.com)

<https://x.com/HubSpot> <https://www.instagram.com/hubspot/> <https://developers.hubspot.com/slack>

<https://uk.linkedin.com/company/applied-power-engineering>

[![ape-logo-white](https://www.appliedpowerengineering.com/hs-fs/hubfs/ape-logo-white.png?width=204&height=75&name=ape-logo-white.png "ape-logo-white")](https://www.appliedpowerengineering.com/)

[![ape-logo](https://www.appliedpowerengineering.com/hs-fs/hubfs/ape-logo.png?width=204&height=75&name=ape-logo.png "ape-logo")](https://www.appliedpowerengineering.com/)

- [Home](https://www.appliedpowerengineering.com)
- Solutions
    - [Emergency Back Up Generators](https://www.appliedpowerengineering.com/emergency-generator)
    - [Service and Maintenance](https://www.appliedpowerengineering.com/generator-service-and-repair)
    - [Generator Upgrade or Replacement](https://www.appliedpowerengineering.com/upgrade-generator)
- Services
    - [Engineering Services](https://www.appliedpowerengineering.com/optioneering-engineering-services)
    - [Commissioning](https://www.appliedpowerengineering.com/generator-commissioning)
    - [Installation and Conversion Services](https://www.appliedpowerengineering.com/generator-installation-services)
    - [Control System Design and Supply](https://www.appliedpowerengineering.com/generator-control-system)
- Providers
    - [COMAP](https://www.appliedpowerengineering.com/comap-power-management-system)
    - [Deep Sea](https://www.appliedpowerengineering.com/deep-sea-control-system)
- Applications
    - [Diesel](https://www.appliedpowerengineering.com/industrial-diesel-generator)
    - [Gas](https://www.appliedpowerengineering.com/industrial-gas-generator)
    - [Control Systems](https://www.appliedpowerengineering.com/control-systems)
    - [Renewable Energy](https://www.appliedpowerengineering.com/applications/renewable-technology)
    - [Power and Control Solutions](https://www.appliedpowerengineering.com/solutions/power-and-control-solutions)
    - [Bi-Fuel Conversions](https://www.appliedpowerengineering.com/bi-fuel-conversions)
- Resources
    - [Blog](https://www.appliedpowerengineering.com/blog)
    - [Downloads](https://www.appliedpowerengineering.com/downloads)
    - [Case Studies](https://145611569.hs-sites-eu1.com/blog/tag/case-studies)
    - [About Us](https://www.appliedpowerengineering.com/about-us)
    - [Environmental Impact](https://www.appliedpowerengineering.com/environmental-impact)
    - [Vacancies](https://www.appliedpowerengineering.com/vacancies)
    - [Contact](https://www.appliedpowerengineering.com/contact)

More results

[Book A Free Discovery Call](https://www.appliedpowerengineering.com/book-a-free-discovery-call)

[Book A Free Discovery Call](https://www.appliedpowerengineering.com/book-a-free-discovery-call)

[Book A Free Discovery Call](https://www.appliedpowerengineering.com/book-a-free-discovery-call)

- [Home](https://www.appliedpowerengineering.com)
- Solutions
  
  
  
  
  
  
  
  
  
    - [Emergency Back Up Generators](https://www.appliedpowerengineering.com/emergency-generator)
    - [Service and Maintenance](https://www.appliedpowerengineering.com/generator-service-and-repair)
    - [Generator Upgrade or Replacement](https://www.appliedpowerengineering.com/upgrade-generator)
- Services
  
  
  
  
  
  
  
  
  
    - [Engineering Services](https://www.appliedpowerengineering.com/optioneering-engineering-services)
    - [Commissioning](https://www.appliedpowerengineering.com/generator-commissioning)
    - [Installation and Conversion Services](https://www.appliedpowerengineering.com/generator-installation-services)
    - [Control System Design and Supply](https://www.appliedpowerengineering.com/generator-control-system)
- Providers
  
  
  
  
  
  
  
  
  
    - [COMAP](https://www.appliedpowerengineering.com/comap-power-management-system)
    - [Deep Sea](https://www.appliedpowerengineering.com/deep-sea-control-system)
- Applications
  
  
  
  
  
  
  
  
  
    - [Diesel](https://www.appliedpowerengineering.com/industrial-diesel-generator)
    - [Gas](https://www.appliedpowerengineering.com/industrial-gas-generator)
    - [Control Systems](https://www.appliedpowerengineering.com/control-systems)
    - [Renewable Energy](https://www.appliedpowerengineering.com/applications/renewable-technology)
    - [Power and Control Solutions](https://www.appliedpowerengineering.com/solutions/power-and-control-solutions)
    - [Bi-Fuel Conversions](https://www.appliedpowerengineering.com/bi-fuel-conversions)
- Resources
  
  
  
  
  
  
  
  
  
    - [Blog](https://www.appliedpowerengineering.com/blog)
    - [Downloads](https://www.appliedpowerengineering.com/downloads)
    - [Case Studies](https://145611569.hs-sites-eu1.com/blog/tag/case-studies)
    - [About Us](https://www.appliedpowerengineering.com/about-us)
    - [Environmental Impact](https://www.appliedpowerengineering.com/environmental-impact)
    - [Vacancies](https://www.appliedpowerengineering.com/vacancies)
    - [Contact](https://www.appliedpowerengineering.com/contact)

[![Book A Free Discovery Call](https://hubspot-no-cache-eu1-prod.s3.amazonaws.com/cta/default/145611569/interactive-218811308226.png)](https://www.appliedpowerengineering.com/hs/cta/wi/redirect?encryptedPayload=AVxigLLxIYULV%2BmvyGLUbUkyuwuLG%2FWkhbkZP9P5B0U4dGB18pkZ5NlDABkCQYZXCChOMYclvGUykxjpU6LXctM%2FE9pRKtPmskdAKqmtOPQ4dUXCcmBWGCFd56EA48aDeUzoyOTNCVh%2Fud5C%2FEhmYiIq%2FLGDqqJlF7gCppsm8bbstEPpn5f5CBQtNIL3u%2BBZ5%2BuTUgqGJ8%2FXQXl3lyU%3D&webInteractiveContentId=218811308226&portalId=145611569)

[01709 288859](tel:01709-288859) [info@apeltd.com](mailto:info@apeltd.com)

<https://uk.linkedin.com/company/applied-power-engineering>

[Case Studies](https://www.appliedpowerengineering.com/blog/tag/case-studies)

# Nationwide STC, Swindon

by [Applied Power Engineering](https://www.appliedpowerengineering.com/blog/author/applied-power-engineering)

 1 min read

 Oct 28, 2024 12:30:00 PM

Applied Power Engineering was commissioned to convert three existing HV (High Voltage) generators and mains control system, adding DUAL redundancy, STOR functionality and implementing some additional ‘What if Scenario's’ to the original system.

Following a successful outcome, and as part of Nationwide’s commitment to continuous improvement, we were then involved in adding to the existing system. This required three 1500kVA JCB diesel generators to increase the data centre’s Kw/m².

As a JCB power products dealer, APE supplied, packaged and installed the Mitsubishi engine powered generators. The three machines have been individually packaged into bespoke acoustic canopies to achieve 70dbA at 1 metre, incorporating all necessary ancillary equipment.

Working together with Imtech Smith, APE developed the control system to allow control of the three new generators, two new mains incomers and two Bus Tie breakers. In addition, there is a ‘Virtual Bus Tie’ arrangement - as well as synchronising the existing generators with the new installation as a single power plant, the design provides a two system solution. This forms two independent island power plants, which under ‘Virtual’ control, provides a synchronised output.

<https://www.linkedin.com/company/applied-power-engineering/>

### Posts by Topics

- [Case Studies (12)](https://www.appliedpowerengineering.com/blog/tag/case-studies)
- [Emergency generator service (2)](https://www.appliedpowerengineering.com/blog/tag/emergency-generator-service)
- [generator (2)](https://www.appliedpowerengineering.com/blog/tag/generator)
- [Generator control system (1)](https://www.appliedpowerengineering.com/blog/tag/generator-control-system)
- [equipment protection (1)](https://www.appliedpowerengineering.com/blog/tag/equipment-protection)
- [hospital (1)](https://www.appliedpowerengineering.com/blog/tag/hospital)

see all

### Latest Articles

[Why Industrial Backup Generators Are Essential For Business Continuity](https://www.appliedpowerengineering.com/blog/investing-in-generators-and-control-systems)

[Why Backup Generators for Data Centres Are Essential For Operations](https://www.appliedpowerengineering.com/blog/power-supply-for-data-centre)

[The Critical Importance Of Hospital Backup Generators](https://www.appliedpowerengineering.com/blog/hospital-backup-generator-requirements)

[New Service - HV, MV, LV Switchgears](https://www.appliedpowerengineering.com/blog/new-service-hv-mv-lv-switchgears)

[APE are Motortech Authorised Solutions Provider](https://www.appliedpowerengineering.com/blog/ape-are-motortech-authorised-solutions-provider)

[Nationwide STC, Swindon](https://www.appliedpowerengineering.com/blog/nationwide-stc-swindon)

[National Grid](https://www.appliedpowerengineering.com/blog/national-grid)

[BSkyB](https://www.appliedpowerengineering.com/blog/bskyb)

[The World’s largest IT company](https://www.appliedpowerengineering.com/blog/the-world-s-largest-it-company)

[Nationwide, Wakefield House](https://www.appliedpowerengineering.com/blog/nationwide-wakefield-house)

### Subscribe to our blog

This is a search field with an auto-suggest feature attached.

- There are no suggestions because the search field is empty.

[![R1_CTA 3_JDRGroup_APE CTA - TB_650x363px_SP_09 Jan 2024 (2)-2](https://hubspot-no-cache-eu1-prod.s3.amazonaws.com/cta/default/145611569/interactive-211148496081.png)](https://www.appliedpowerengineering.com/hs/cta/wi/redirect?encryptedPayload=AVxigLL9VyinImN%2FWgmBe5t0p3kaI%2BKVF%2FANlpIYXDbMU8OKn8D6OnmKVpKR5xarQkGK%2BX8MybsOuFnqv6N4iIJjRYvuqfKTLfhCjElknOvaM8ZX2DtQsmmz01JkF13Zx5M75lMFig%3D%3D&webInteractiveContentId=211148496081&portalId=145611569)

Share this

[Share on X](https://x.com/intent/post?url=https://www.appliedpowerengineering.com/blog/nationwide-stc-swindon&text=Nationwide%20STC,%20Swindon%20|%20Case%20Studies%20|%20A.P.E) [Share on Facebook](https://www.facebook.com/sharer/sharer.php?u=https://www.appliedpowerengineering.com/blog/nationwide-stc-swindon&t=Nationwide%20STC,%20Swindon%20|%20Case%20Studies%20|%20A.P.E) [Share on LinkedIn](https://www.linkedin.com/shareArticle?mini=true&url=https://www.appliedpowerengineering.com/blog/nationwide-stc-swindon&t=Nationwide%20STC,%20Swindon%20|%20Case%20Studies%20|%20A.P.E)

Previous story

[← National Grid](https://www.appliedpowerengineering.com/blog/national-grid)

<https://www.appliedpowerengineering.com/blog>

Next story

[APE are Motortech Authorised Solutions Provider →](https://www.appliedpowerengineering.com/blog/ape-are-motortech-authorised-solutions-provider)

## You May Also Like

These Related Stories

[APE are Motortech Authorised Solutions Provider](https://www.appliedpowerengineering.com/blog/ape-are-motortech-authorised-solutions-provider)

![](https://www.appliedpowerengineering.com/hubfs/arch-jpeg.webp)

### APE are Motortech Authorised Solutions Provider

Oct 29, 2024 12:55:24 PM 1 min read

[Greenhouses](https://www.appliedpowerengineering.com/blog/greenhouses)

![machine](https://www.appliedpowerengineering.com/hubfs/Images/machine.webp)

[Case Studies](https://www.appliedpowerengineering.com/blog/tag/case-studies)

### Greenhouses

Aug 7, 2024 10:15:00 AM 1 min read

[Landfill (renewable)](https://www.appliedpowerengineering.com/blog/landfill-renewable)

![Landfill (renewable)](https://www.appliedpowerengineering.com/hubfs/Renewable%20Technology.webp)

[Case Studies](https://www.appliedpowerengineering.com/blog/tag/case-studies)

### Landfill (renewable)

Aug 21, 2024 1:30:00 PM 1 min read

### Get Email Notifications

### No Comments Yet

Let us know what you think

![ape-logo-white](https://www.appliedpowerengineering.com/hs-fs/hubfs/ape-logo-white.png?width=206&height=75&name=ape-logo-white.png)

###### Applied Power Engineering Limited Unit 12-12A Waddington Way Rotherham S65 3SH T: 01709 711084

###### Company Registration No: 4288048 Vat No: 157 8089 69

[Browse our GitHub projects](https://uk.linkedin.com/company/applied-power-engineering)

Solutions

- [Emergency Back Up Generators](https://www.appliedpowerengineering.com/emergency-generator)
- [Service and Maintenance](https://www.appliedpowerengineering.com/generator-service-and-repair)
- [Generator Upgrade or Replacement](https://www.appliedpowerengineering.com/upgrade-generator)
- [Industrial Backup Generators](https://www.appliedpowerengineering.com/industrial-backup-generator)
- [Commercial Backup Generators](https://www.appliedpowerengineering.com/commercial-backup-generator)

Services

- [Engineering Services](https://www.appliedpowerengineering.com/optioneering-engineering-services)
- [Commissioning](https://www.appliedpowerengineering.com/generator-commissioning)
- [Installation and Conversion Services](https://www.appliedpowerengineering.com/generator-installation-services)
- [Control System Design and Supply](https://www.appliedpowerengineering.com/generator-control-system)

Providers

- [COMAP](https://www.appliedpowerengineering.com/comap-power-management-system)
- [Deep Sea](https://www.appliedpowerengineering.com/deep-sea-control-system)

Applications

- [Diesel](https://www.appliedpowerengineering.com/industrial-diesel-generator)
- [Gas](https://www.appliedpowerengineering.com/industrial-gas-generator)
- [Control Systems](https://www.appliedpowerengineering.com/control-systems)
- [Renewable Energy](https://www.appliedpowerengineering.com/applications/renewable-technology)
- [Power and Control Solutions](https://www.appliedpowerengineering.com/solutions/power-and-control-solutions)
- [Bi-Fuel Conversions](https://www.appliedpowerengineering.com/bi-fuel-conversions)

 Resources

- [Blog](https://www.appliedpowerengineering.com/blog)
- [Downloads](https://www.appliedpowerengineering.com/downloads)
- [Case Studies](https://145611569.hs-sites-eu1.com/blog/tag/case-studies)
- [About Us](https://www.appliedpowerengineering.com/about-us)
- [Environmental Impact](https://www.appliedpowerengineering.com/environmental-impact)
- [Vacancies](https://www.appliedpowerengineering.com/vacancies)
- [Contact](https://www.appliedpowerengineering.com/contact)

 Industries

- Data Centers
- Hospitals
- Distribution Centers
- Utilities
- Finance/Banking
- Telecommunications
- Military

 Copyright © 2026 Applied Power Engineering, Inc. Designed and Developed by [JDR Group](http://www.jdrgroup.co.uk).

- [Terms and Conditions](https://www.appliedpowerengineering.com/hubfs/Website-Terms-And-Conditions-For-APE.pdf)
- [Privacy](https://www.appliedpowerengineering.com/hubfs/APE-Privacy-Policy.pdf)
- [Cookie](https://www.appliedpowerengineering.com/hubfs/APE-Cookie-Policy.pdf)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Applied Power Engineering",
    "url" : "https://www.appliedpowerengineering.com/blog/author/applied-power-engineering"
  },
  "dateModified" : "2025-05-15T17:28:14.273Z",
  "datePublished" : "2024-10-28T12:30:00.000Z",
  "headline" : "Nationwide STC, Swindon | Case Studies | A.P.E",
  "image" : [ "https://www.appliedpowerengineering.com/hubfs/Images/case-study/nationwide-stc-swindon.webp" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.appliedpowerengineering.com/blog/nationwide-stc-swindon",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.appliedpowerengineering.com/hubfs/ape-logo-1.png"
    }
  }
}
```

```json
{
  "@context" : "https://schema.org",
  "@type" : "LocalBusiness",
  "address" : {
    "@type" : "PostalAddress",
    "addressCountry" : "UK",
    "addressLocality" : "Rotherham",
    "addressRegion" : "England",
    "postalCode" : "S65 3SH",
    "streetAddress" : "Unit 12-12A Waddington Way"
  },
  "alternateName" : "APE",
  "contactPoint" : {
    "@type" : "ContactPoint",
    "areaServed" : "GB",
    "availableLanguage" : "en",
    "contactType" : "customer service",
    "telephone" : "0845 652 5454"
  },
  "geo" : {
    "@type" : "GeoCoordinates",
    "latitude" : 53.4481,
    "longitude" : -1.3146
  },
  "image" : "https://www.appliedpowerengineering.com/hs-fs/hubfs/commissioning.webp",
  "logo" : "https://www.appliedpowerengineering.com/hs-fs/hubfs/ape-logo-white.png?width=204&height=75&name=ape-logo-white.png",
  "name" : "Applied Power Engineering Ltd",
  "priceRange" : "£",
  "sameAs" : [ "https://uk.linkedin.com/company/applied-power-engineering" ],
  "telephone" : "01709 288058",
  "url" : "https://www.appliedpowerengineering.com/"
}
```